Retrofit sequencing

type
research-playbook

Purpose: turn an authorised twelve-lamp pilot into a decision the council can defend. The sequence is a proposal; only the pilot authorisation is recorded in the minutes.

  1. Audit first. Run the night lighting audit; do not order fittings against an inventory with 31 unknowns.
  2. Fix the free wins. Bring non-compliant council fittings to full cut-off and the lumen budget on the normal replacement cycle. This needs no pilot and no new money.
  3. Pilot twelve lamps on Market Row. Record the manufacturer's claims before installation: 1,850 lm, 2200 K, zero uplight (data sheet).
  4. Measure three things, not one. Sky brightness at S4 and S9, eye-height glare photographs, and resident reports from the same route. A single metric will be gamed by the easiest improvement.
  5. Test dimming under the tariff. Run the 30% window for the six hours the tariff requires, and confirm where the 70% threshold is measured.
  6. Decide on evidence, then scale. The colour question and the cost question are answered here or not at all.

What this keeps separate: the pilot's ecological hypothesis (from Wren Valley), its financial case (from the tariff), and its public-acceptance case (from the resident work). Mixing them is how a pilot becomes a mandate without evidence.